Modern Rainbow Sampler Quilt - For The Quilter's Planner 2020

It has been almost impossible to keep this secret! I am beyond excited to share with you that I have a quilt featured in the 2020 Quilter’s Planner! And it went all the way to Costa Rica for a photo shoot! Wish I could have hand delivered it!! Just look at these amazing pictures Kitty from The Night Quilter, took of it!!

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter

My quilt is a modern sampler quilt with lots of negative space. I mixed up the sizes of the blocks as I love the sense of depth you get from doing that.

When it came to colours, obviously it had to be rainbow , I think if you cut me in half you'd find rainbow running through my core lol! I loved working with the Quantum range by Giucy Giuce.

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter

Does all that negative space freak you out? Well I also think this pattern would make a fabulous table runner! That’s next on my list!

I decided to quilt the large sections of negative space with straight line quilting. I then echoed the blocks and filled in the gaps with a variety of free motion quilting.

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter

Each year Stephanie from The Quilter’s Planner works with a fabric designer to design the look of the planner and to be featured in it. This year that designer is a fellow Brit: Karen Lewis!

Have you had a Quilter’s Planner before? I love mine! With your planner you also get a magazine with all the patterns for the featured quilts, of which there are twelve, plus the Block of the Month project by Karen Lewis.

The Planner is chocked full of useful info as well. I particularly love the page for tracking all my projects! It helps to get them done! But the info pages are great for easy reference.

If you are in the States you can pre-order your planner now and even get to customise it. Options for customisation include: Cover; Sunday or Monday start; and which weekly layout you prefer. I think I’m going for the Teal and for me it has to be the horizontal layout with a Monday start!

And I’m loving these matching accessories too. Particularly love the dry erase lists.

If you aren’t in the States you can do that too, although sometimes the shipping can be off putting. So the good news is that Karen Lewis will be stocking these for anyone based in the UK or Europe. Sadly they won’t be customisable, but I think she might be stocking some of the accessories too.

📸 Photo credit to Kitty Wilkin @nightquilter

📸 Photo credit to Kitty Wilkin @nightquilter